Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project.

Project Scope: This project is intended to grind away the top 2″ of existing asphalt and replace with new asphalt per design specs. This work will take place for approximately 1,400 linear feet of roadway along Stadium Way from Nevada Street to the entrance of the Smith Center Parking Lot. Stadium way is a 4-lane roadway with a concrete center median for most of this section. Work may begin May 15, 2023 and Substantial Completion shall be achieved by July 31, 2023.  Proposals MUST BE based on this Contract Time.

Project Physical address: Stadium Way, Pullman, WA 99164

Bid Estimate:  $275,000 – $300,000