Facilities Services maintains a Small Works Roster of contractors per the requirements of WAC 504-50-080. Whenever the estimated cost of any construction, building, renovation, remodeling, alteration, repair, or improvement of real property does not exceed three hundred thousand dollars ($300,000), excluding tax, the Department of Facilities Service at Washington State University, is authorized to use the Small Works Roster in lieu of public advertisement for bids.
Contractors interested in being included in the roster may download the current Small Works Roster Manual (which includes the application) below.
The 2023 Small Works Roster Manual which includes the application is available below.
For best opportunities of projects bid in the 2023 year, please return your application by April 1, 2023.
The bidding documents attached below are available for all interested bidders and plancenters. The University does not provide printing services; it is the bidders responsibility to print the drawings to the appropriate scale indicated. We encourage the use of professional printing shops.
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
Install one new crosswalk and related signage on Stadium Way near the intersection with College Avenue on the Pullman Campus of Washington State University. Work includes new ADA ramps, new solar-powered flashing beacons and MUTCD signs, and crosswalk signage. At existing crossing, signage and street markings will be removed and ADA ramps filled in with new curbs. Substantial Completion shall be achieved in 30 days from Notice to Proceed.
Proposals MUST BE based on this Contract Time.
Project Physical address:
Stadium Way at Intersection with College Ave, Pullman, WA
- Bid results are available below.
Base Bid Estimate: $175,000 – $225,000
Alternate 1: Install new solar-powered flashing beacons, MUTCD signs, and road striping as shown on drawing C2.2 located near the Gannon Bridge.
Alternate 2: Install new solar-powered flashing beacons, MUTCD signs, and road striping as shown on drawing C2.3 located near Kruegel Hall.
Alternate 3: Install new solar-powered flashing beacons, and MUTCD signs as shown on drawing C2.4 located near Spokane St.
Point of Contact:
Project Manager: Cyndi Arbour
Email: carbour@wsu.edu
Phone: 509-335-7010
In-Person Pre-Bid Meeting:
Date and time: June 27, 2024 at 1:00 p.m.
Location: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Room: 173
Bid Submittal Deadline:
Date and time: July 16, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: July 16, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/94462755687?pwd=uSflvck4w2wOH0NWtLjQ1eYjRbhbYa.1
By Phone: 253-215-8782
Meeting ID: 944 6275 5687
Password: 172160
Bid Documents:
Advertisement
Project Manual
Drawings
Planholder’s List
Addendum 1
Addendum 2
Bid Results
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
This contract provides for the construction of a shared-use pathway from Fairway Lane to Valley Road along Orchard Drive including select new ADA pedestrian ramps and other work all in accordance with the Contract plans, Contract Provisions, and the 2024 WSDOT Standard Specifications. Landscaping and Irrigation Improvements are covered under Bid Alternate #1 and Walkway Lighting Improvements are included as Bid Alternate #2.
The entire project will be complete in **65 Working Days for base bid, additional days will be added if Bid Alternate #2 is awarded to account for lead time of lighting fixtures and poles, based on current market waits for equipment.**
Base Bid Construction Estimate: $489,300
- The bid results are available below.
Point of Contact:
Owner’s Representative: Angela Taylor, P.E., Keller and Associates, Project Manager
Email: ataylor@kellerassociates.com
Phone: 509-295-6095
WSU Project Manager: Cyndi Arbour
Email: carbour@wsu.edu
Phone: 509-335-7010
Last day for Questions:
June 18, 2024
Bid Submittal Deadline:
Date and time: June 25, 2024, prior to 2:00 p.m.
By Hard Copy ONLY: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: June 25, 2024, at 2:30 p.m.
Location: McCluskey Services Building, Room 173, 2425 East Grimes Way, Pullman, WA
Optional Zoom: https://wsu.zoom.us/j/91607678801?pwd=egdYJboIVcfap12q09UeDabaoQvZOK.1&from=addon
By Phone: 253-215-8782
Meeting ID: 916 0767 8801
Password: 810622
Bid Documents:
Advertisement
Specifications
Plans
Planholders
Addendum 1
Bid Results
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
The project will remove approximately 1,810 Linear feet of existing steel irrigation mainline and install new HDPE irrigation line within existing easement boundaries at Sunrise Orchard of Washington State University. Reconnect to existing transite pipe. Onsite work may not begin before October 1, 2024. Substantial Completion shall be achieved by March 1, 2025. Proposals MUST BE based on this Contract Time.
Project Physical address:
75 Sunrise Ct, Rock Island, WA 98850.
Base Bid Estimate: $165,000 – $180,000
- Bid Results are available below. Thank you to all bidders.
Point of Contact:
Project Manager: Adam Ferry
Email: aferry@wsu.edu
Phone: 509-335-9028
Virtual Pre-Bid Meeting:
Date and time: May 16, 2024 at 10:00 a.m.
Zoom Only: https://wsu.zoom.us/j/93863779652?pwd=c1FlcjR1TUc0VkREL1BBdThYczdMQT09
By Phone: 253-215-8782
Meeting ID: 938 6377 9652
Password: 321919
Bid Submittal Deadline:
Date and time: May 30, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: May 30, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/99704932385?pwd=cU0wYmJiOHg1TXM4QlYxQ0ZZSUhLUT09
By Phone: 253-215-8782
Meeting ID: 997 0493 2385
Password: 841056
Bid Documents:
Addendum 1
Advertisement
Project Manual
Drawings
Planholder’s List
Bid Results
Proposals will be received by Washington State University, Facilities Services, from firms interested in providing mixed bed media regeneration for the Pullman campus of Washington State University.
Point of Contact:
Jeff Lannigan
lannigan@wsu.edu
Phone: 509-335-7221
Pre-RFP Meeting:
Date: May 7, 2024, 2:00 pm
By Zoom: https://wsu.zoom.us/j/97631000733?pwd=ZC9lSjh1SkZ3RG9vYXJ4cEpHc0FWQT09&from=addon
By Phone: 253-215-8782
Meeting ID: 976 3100 0733
Passcode: 697838
Proposal Deadline
Date: May 21, 2024 prior to 3:00 p.m.
By email to: contracts@wsu.edu & lannigan@wsu.edu
Finalists or Selection Announcement Date:
Date: May 29, 2024
RFQ Documents:
Advertisement
Request for Proposals
Appendix 1 – Cost Proposal Form
Appendix 2 – Master Maintenance Agreement
Appendix 3 – Onsite Work Terms and Conditions
Appendix 4 – Prevailing Wage Rates
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
This project at the Electrical Mechanical Engineering Building will add additional cooling capacity and a UPS system to server room 106 per the approved construction drawings. Construction and demolition will take place in server room 106 and the ground level mechanical room 003A, with a new cooling unit to be placed on the roof of the building. General scope includes removing and reconfiguring existing duct work, installing new duct work to create a hot and cold isle, installing a new DX “ACU-3/CU-3” cooling system, removing an existing power conditioner, and installing owner supplied UPS system per construction drawings. On-site work scheduling must be coordinated with the WSU Construction Manager and IT Systems and Services staff. Contract time shall be 190 days from Notice to
Proceed to Substantial Completion. Proposals MUST BE based on this Contract time.
Project Physical address:
335 NE Spokane Street, Pullman, WA 99164
Base Bid Estimate: $350,000 – $400,000
- Bid Results are available below.
Point of Contact:
Project Manager: Rick Hull Jr.
Email: richard.jr.hull@wsu.edu
Phone: 509-335-9109
In Person Pre-Bid Meeting:
Date and time: May 7, 2024 at 10:00 a.m.
Location: McCluskey Services Building Room 190D
Bid Submittal Deadline:
Date and time: May 21, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: May 21, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/98644245953?pwd=anlPelpyWGVRcmtLajNUd1M3cFVOZz09
By Phone: 253-215-8782
Meeting ID: 986 4424 5953
Password: 324573
Bid Documents:
Advertisement
Project Manual
Electrical Drawings
Mechanical Drawings
Planholder’s List
Addendum 1
Addendum 2
Bid Results
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
The Wilke Pole Barn project includes the development of a 16-foot by 100-ft (16,000 square feet) addition to the existing pole barn. Work also includes the installation of several man doors, a roll up door and concrete flat work. Contract Time shall be 90 Days from Notice to Proceed to Substantial Completion. Proposals MUST BE based on this Contract Time.
Project Physical address:
39440 State Highway 2 E, Davenport, WA 99122
Base Bid Estimate: $80,000 – $140,000
- Bid Results are available below. Thank you to all bidding contractors.
Point of Contact:
Project Manager: Eric Smith
Email: eric.smith2@wsu.edu
Phone: 509-358-7629
In Person Pre-Bid Meeting:
Date and time: April 25, 2024 at 1:00 p.m.
Location: 39440 State Highway 2 E, Davenport, WA 99122
Bid Submittal Deadline:
Date and time: May 9, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: May 9, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/94750867358?pwd=RG1VRjBnMzNsQTk2SXFFMlpjWmJmdz09
By Phone: 253-215-8782
Meeting ID: 947 5086 7358
Password: 236151
Bid Documents:
Advisement
Project Manual
Drawings
Planholder’s List
Addendum 1
Bid Results
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
Rogers and Orton Halls are 12 story student dorms on the Pullman campus of Washington State University. The condition of the exterior columns are showing signs of water damage and subsequent deterioration at floor levels 4, 7, 11 and at splice joints on the columns at the West and East side of both halls. Although the damage progression appears to be fairly slow, we want to repair these areas to prevent further deterioration and extend the useful life of the structures. Substantial must be achieved by August 5th, 2024. Onsite construction may not occur before
May 13th, 2024. Proposals MUST BE based on this Contract Time.
Project Physical address:
Rogers Hall- 1355 SE Olympia Ave Pullman, WA 99164
Orton Hall- 1475 SE Olympia Ave Pullman, WA 99164
Base Bid Estimate: $300,000-$350,000
- Bid Results are available below.
Point of Contact:
Project Manager: Kevin Poitra
Email: kpoitra@wsu.edu
Phone: 509-335-4206
Mandatory In Person Pre-Bid Meeting:
Date and time: April 18, 2024 at 2:00 p.m.
Location: McCluskey Services Building, Room 190D
Bid Submittal Deadline:
Date and time: May 1, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: May 1, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/99331009482?pwd=VWRGYWJIWEN6U1BXL2lvZHhOSHF6dz09
By Phone: 253-215-8782
Meeting ID: 993 3100 9482
Password: 151013
Bid Documents:
Advertisement
Project Manual
Drawings
Planholders List
Addendum 1
Bid Results
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
The Washington State University Pullman Campus will be repairing the Fine Arts Parking Garage surface on levels 1, 2 and 3. Specific tasks will include: concrete spall and delamination repair on level 1 slab on grade and outside entrance and exit lanes; concrete spall and delamination repair on level 2 and level 3 elevated parking deck slabs and helical ramps; drain slope improvements on levels 2 and 3; cold joint and random crack sealing on all levels; levels 2 and 3 outside concrete sunshade concrete repair; application of MMA protective polymer overlay on elevated helical ramp drive lanes; application of elastomeric traffic deck coating system on level 2 and 3 parking stall lanes; application of an organofunctional silane corrosion inhibitor to surface treatment over footing strap tie areas on level 1; new pavement markings and parking stall striping on level 2 and 3. Safe off elevator machine room. Coordinate with Eltec (Elevator Mechanic). Substantial Completion must be achieved by August 5th, 2024. Proposals MUST BE based
upon this Contract Time.
Project Physical address: 1615 NE Wilson Mall Pullman, WA 99164
Base Bid Estimate: $800,000-$850,000
- Bid Results are available below.
Point of Contact:
Project Manager: Kevin Poitra
Email: kpoitra@wsu.edu
Phone: 509-335-4206
Mandatory In Person Pre-Bid Meeting:
Date and time: April 17, 2024 at 1:00 p.m.
Location: McCluskey Services Building, Room 173
Bid Submittal Deadline:
Date and time: April 30, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: April 30, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/96678658356?pwd=bDAxdnF2U2dJSXArdnpVWVE2akZhdz09
By Phone: 253-215-8782
Meeting ID: 966 7865 8356
Password: 981295
Bid Documents:
Advertisement
Project Manual
Drawings
Planholders List
Addendum 1
Addendum 2
Bid Results
Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project.
Project Scope:
This project will grind existing asphalt and overlay new asphalt on Stadium Way on the Pullman Campus of Washington State University per the drawings and specifications. Sections of road starts at the north end of the Vogel Building and continues to the NE North Fairway Dr intersection, approximately 840 linear feet of roadway. Contract Time: Substantial completion shall be achieved by August 1, 2024 after spring classes have ended. Proposals must be based on this contract time.
Project Physical address: Stadium Way, Pullman, WA
Base Bid Estimate: $150,000 – $170,000
Alternate 1 – Grind/Pave North Fairway to Cougar Way.
Alternate 2 – Grind/Pave Wilson Rd Intersection to North end of Vogel Building.
Alternate 3 – Grind/Pave Nevada St Intersection.
Alternate 4 – Replace existing concrete ADA ramps as indicated on the drawings and update crossing equipment at the Stadium Way and Ferdinand’s Ln. intersection and in front of the WSU Stadium Ticket Office.
Alternate 5 – Replace existing concrete ADA ramps as indicated on the drawings and update crossing equipment at Stadium Way and NE Fairway Rd.
Alternate 6 – Regrade and realign the Flag Lane and Stadium Way intersection, and the Flag Lane and Cougar Way intersection as per JUB drawings C3.00 and C3.01 and related specifications. Work includes modifications to adjacent concrete sidewalks, including ADA ramps, concrete curb, and stamped asphalt road pavement. Two traffic light fixtures will be relocated.
- The University has rejected all bids. Please see the notice below.
Point of Contact:
Project Manager: Adam Ferry
Email: aferry@wsu.edu
Phone: 509-335-9028
In Person Pre-Bid Meeting:
Date and time: April 3, 2024 at 10:00 a.m.
Location: McCluskey Services Building, Room 190D
Bid Submittal Deadline:
Date and time: April 18, 2024, prior to 2:00 p.m.
By Email: contracts@wsu.edu
Or by Hard Copy: McCluskey Services Building, 2425 East Grimes Way, Pullman, WA
Bid Open:
Date and time: April 18, 2024, at 2:30 p.m.
Zoom Only: https://wsu.zoom.us/j/97634529190?pwd=ZkRkci9qbkRYZ2hQaGtGNUVBMitTdz09
By Phone: 253-215-8782
Meeting ID: 976 3452 9190
Password: 758360
Bid Documents:
Advertisement
Project Manual
Drawings
Planholder’s List
Addendum 1
Addendum 2
Bid Results
Reject All Bids
Listed below are all bid results for the projects bid during the 2024 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- WSU Golf Team Clubhouse Upgrade Exterior & Addition
- Smith Center Café Beverage Lab Remodel
- Columbia Village Apartments Sidewalk Replacement
- Orton Hall Interior Renovations
- Stadium Way Crosswalk Improvements
- Stadium Way Roadways: Repave Stadium Way, Wilson Road to Cougar Way
- Fine Arts Parking Garage Surface Repair
- Rogers and Orton Halls Exterior Repairs
- Wilke Pole Building
- EEME Additional DX Units in 106
- Sunrise Orchard Install Irrigation Mainline
- Puyallup Kalkus Hall Accessible Toilet Room Addition
- Repair/Replace Sidewalk/Pathway Along Orchard Dr.
- Re-Bid Stadium Way Crosswalk Improvements
Listed below are all bid results for the projects bid during the 2023 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Move Herbarium to Owen Science 4th Floor
- Pullman Student Success Center Phase 1
- Shared Use Path on SR270 to Stadium Way
- Food Services Building Replace Roof
- WSU Sunrise Orchard Irrigation Line and Pond
- Smith Gym Suite 60 Remodel
- Rogers Hall Interior Renovations
- Tri-Cities CIC Building New Gender Inclusive Restrooms
- Rogers Orton Storefront Upgrades
- Chinook Complex Deck Repairs
- Rebid Dodgen Research Facility Nuclear Science Center HVAC Renewal
- Elevator Maintenance and Repair
Listed below are all bid results for the projects bid during the 2022 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Electrical Distribution Replace Multiple 5kv Feeders
- Utility Tunnels Lid Replacement NE Alumni and E Grimes Way
- McCroskey Gutter System Replacement
- Kalkus and Guest House Roof Replacement
- Biotech/Life Sciences Deionized Water Piping Upgrades
- Vancouver Science & Engineering Building Elevator Modernization
- Tri-Cities CIC Chiller Replacement
- Dodgen Research Facility Nuclear Science Center HVAC Renewal
- Wegner Hall Room 310, 320B and 320BA HVAC Upgrades
- Shared Use Path on SR 270 to Stadium Way
Listed below are all bid results for the projects bid during the 2021 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
Listed below are all bid results for the projects bid during the 2020 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Sloan Hall/Dana Hall Roof Replacement
- WSU Spokane EWU Center Roof Replacement
- Slurry Seal Parking Lots
- Steptoe Village Roof Replacement
- Mount Vernon Install Head-House
- Sidewalks: Repair/Replace Sidewalk along Orchard Drive
- Abelson Elevator Modernization
- WSU Spokane South Campus Parking Lot Expansion
- Food Science and Human Nutrition Elevator Modernization
- Spokane HERB Cooling Tower Replacement
Listed below are all bid results for the projects bid during the 2019 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Todd Hall Install Storefront Doors
- Stephenson South Replace Roof
- Veterinary Teaching Hospital Replace Copper Shielding
- Food Quality Creamery Control Upgrades
- Captive Elk Facility
- Beasley Remove Overhead Stage Rigging
- Beasley Soffit Removal
- Slurry Seal Parking Lots and Various Roadways
- Jensen-Byrd Cross Connection Backflow Device Improvements
- WSU Tri-Cities Wine Science Center Teaching Labs 204 & 206
Listed below are all bid results for the projects bid during the 2018 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Bid Tab – Re-Bid Food Quality Building Install Catwalk in Receiving Bay
- Bid Tab – Cattle Feeding Laboratory Construct Pole Building
- Bid Tab – Eastlick STEM Teaching Lab 170 Abatement
- Bid Tab – Eastlick STEM Teaching Lab 170 & HVAC Upgrade
- Bid Tab – Roadways Repave Stadium Way from SR270 to Nevada Street
- Bid Tab – Install GPON in Housing Apartment Complexes
- Bid Tab – College Avenue Steam Tunnel Lid Repair
- Bid Tab – Knott Dairy Complex Renew-Renovate Buildings and Systems
- Bid Tab – Chilled Water Staorge Facility Replace Storage Tank Roof
- Bid Tab – Install GPON in North Apartment Complexes
- Bid Tab – Domestic Water Meter Installations at Campus Perimeter
- Bid Tab – Food Quality Addition Install New Dairy Equipment
- Bid Tab – Smith Gym Replace Windows on West Facade
- Bid Tab – Upgrade Feeder EA9
- Bid Tab – Re-Bid Food Quality Addition Install New Dairy Equipment
Listed below are all bid results for the projects bid during the 2017 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Bid Tab – GWSP Install Structural Beams in Generator Room 102.pdf
- Bid Tab – Soccer Field Upgrade Phase II 1-24-17.pdf
- Bid Tab – Cooper Publications Roof Replacement – 8436-2016.pdf
- Bid Tab – Regents Stearns Dining Replace Roof.pdf
- Bid Tab – Prosser IAREC Tenant Improvements.pdf
- Bid Tab – Grimes Way Playfield Parking Lot.pdf
- Bid Tab – Cougar Football Complex Slab Reinforcement.pdf
- Bid Tab – WSU PBS Fourth Floor Remodel.pdf
- Bid Tab – Rogers Hall Install Fiber Optic Cabling & GPON Equip.pdf
- Bid Tab – Barnard McGregor Electrical Improvements – 9476-2017.pdf
- Bid Tab – Research and Technology Park Boiler Replacement.pdf
- Bid Tab – Wilke Pole Building.pdf
- Bid Tab – Re-Bid Barnard McGregor Electrical Improvements.pdf
- Bid Tab – Valley Crest Parking Lot Phase 2.pdf
- Bid Tab – Spokane Academic Center Leadership & Diversity Office.pdf
- Bid Tab – HERB Kitchen & Nutrition Lab Renovation.pdf
- Bid Tab – Food Quality Purchase & Install Catwalk.pdf
- Bid Tab – Todd Hall Renovate Suite 402.pdf
- Bid Tab – Cattle Feed Lab Demo Building and Develop Gravel Parking Lot.pdf
- Bid Tab – Chief Joe Bldgs B&C Landscape.pdf
Listed below are all bid results for the projects bid during the 2016 year. This list includes publicly bid as well as Small Works Roster invited bid projects.
- Bid Tab – Soccer Field Upgrade Phase II 1-21-15.pdf
- Bid Tab – Presidents Residence Exterior Renovation.pdf
- Bid Tab – Food Quality Building East Side Addition.pdf
- Bid Tab – McEachern Roof Replacement.pdf
- Bid Summary – Clark Hall AV Upgrades.pdf
- Bid Tab – Daggy Parking Lower Level Phase 2.pdf
- Bid Tab Wilson-Short Elevator Modernization.pdf
- Bid Tab – WSU Research Park COE Solar Array 5-17.pdf
- Bid Tab – Valley Crest Village RePave Parking Lot.pdf
- Bid Tab – Streit Hall Install Fiber Optics.pdf
- Bid Summary – Utility Tunnel System Abate Asbestos Along Grimes Way.pdf
- Bid Tab – Grimes Way Steam Plant Tank Liner Replacement.pdf
- Bid Summary – Stauber Raptor Facility Work Room Remodel.pdf
- Bid Tab – Chief Joseph Interior Renovation Buildings B&C Abatement.pdf
- Bid Tab – Spokane Speech Research Facility.pdf
- Bid Tab – Feed Prep Install Platform for Cyclone Cleaning.pdf
- Bid Tab – Chief Joe Buildings B and C.pdf
- Bid Tab – WSUV Classroom Bldg HSC.pdf
- Bid Tab – Perham Hall Install Fiber Optics and GPON Equipment.pdf
- Bid Tab – Wilson Short Elevator Renewal.pdf