Re-Bid – Dodgen Research Facility Nuclear Science Center HVAC Renewal

Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project at the Dodgen Research Facility will renew HVAC and electrical components serving the pool and beam rooms. Demolition and new construction will take place throughout the facility with most occurring in the mechanical […]

Categories: Archive

Bid – Rogers and Orton Hall Storefront Upgrades

Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Rogers Hall and Orton Hall are 12 story student dorms located on the Pullman Campus of Washington State University. WSU Student Housing wants to upgrade the main entry and lobby areas by removing and replacing […]

Categories: Archive

Re-Bid – Prosser Hamilton Lab Bldg Roof Replacement

Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Remove approximately 25,000 square feet of existing roof material and insulation. Construct new parapets around perimeter to allow for new insulation installation of R-38 minimum, and re-slope to existing drains. Install new EPDM roofing membrane. […]

Categories: Archive

RFQ – Master Agreement for Architectural/Engineering (A/E) Design and Consulting Services at WSU Campuses and Extension Facilities

Statements of Qualifications Submittals will be received by Washington State University, Facilities Services, from firms interested in providing Master A/E Consultant Services for all WSU Campuses and Extension Facilities. The selection announcement is available below. Point of Contact:Louise Sweeney, Project Manager Leadlasweeney@wsu.edu Phone: 509-335-4437 Statement of Qualifications Submittal Deadline:Date: Thursday, August 10, 2023 prior to […]

Categories: Archive

Bid – Tri-Cities CIC Building New Gender Inclusive Restrooms

Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project is to construct a new gender inclusive restroom on the 2nd floor of the Consolidated Information Center Building. This new 126 square foot space will include two new ADA water closet stalls […]

Categories: Archive

Bid – Prosser Hamilton Lab Bldg Roof Replacement

Sealed bids were requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Remove approximately 25,000 square feet of existing roof material and insulation. Construct new parapets around perimeter to allow for new insulation installation of R-38 minimum, and re-slope to existing drains. Install new EPDM roofing membrane. […]

Categories: Archive

Design-Build RFQ – Champions Center

Statements of Qualifications Submittals will be received by Washington State University, Facilities Services, from firms interested in providing Progressive Design-Build services for a 12,000 square foot dedicated athlete well-being resources space on the Pullman campus of Washington State University. Teams responding should be limited to the builder and the prime designer. Congratulations to the Selected […]

Categories: Archive

Bid – Roadways: Pave Stadium Way Nevada to Grimes

Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project is intended to grind away the top 2″ of existing asphalt and replace with new asphalt per design specs. This work will take place for approximately 1,400 linear feet of roadway along […]

Categories: Archive

Bid – WSU Sunrise Orchard Irrigation Line and Pond

Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Construct 2.5 million gallon irrigation storage pond at orchard site with secondary pump system intended to be used as the main irrigation supply at Washington State University Wenatchee. Substantial Completion shall be achieved within […]

Categories: Archive