Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: Construct 2.5 million gallon irrigation storage pond at orchard site with secondary pump system intended to be used as the main irrigation supply at Washington State University Wenatchee. Substantial Completion shall be achieved within […]
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Base Bid: Tear Off and New Roof InstallationThe Food Service building is located on the Washington State University Campus in Pullman WA. This roof project will remove existing roofing system to metal deck (removal includes asbestos […]
Statements of Qualifications Submittals will be received by Washington State University, Facilities Services, from firms interested in providing Progressive Design-Build services for a new Schweitzer Engineering Hall on the Pullman campus of Washington State University. Firms need to be aware that at this time only the Designer-Builder team will be picked, all other subcontracted firms […]
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project at the Wegner Hall Facility will renew HVAC and electrical components serving Rooms 320BA, 320B and 310. Demolition and new construction will take place throughout Rooms 320BA, 320B, 310, 300S in front […]
Statements of Qualifications Submittals will be received by Washington State University, Facilities Services, from firms interested in providing Progressive Design-Build services for the Taylor Sports Complex which will replace the air supported structure on the Pullman campus of Washington State University. Firms need to be aware that at this time only the Designer-Builder team will […]
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project involves the removal of the existing 17,400lb chiller from the CIC, including capturing 500lb of R-22 refrigerant. Remove old chilled water piping to accommodate removal of the chiller and installation of new […]
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project at the Dodgen Research Facility will renew HVAC and electrical components serving the pool and beam rooms. Demolition and new construction will take place throughout the facility with most occurring in the […]
Sealed bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope:Install a concrete paved path that alternates between 10 and 12ft wide with 2ft gravel shoulders approximately 1,600 LF from the intersection of SR270 and Bishop Blvd westward to Stadium Way. Install new landscaping and […]
Washington State University, Facilities Services, expects to issue a RFQ in January 2023 for the purposes of identifying Design/Build teams for the Schweitzer Hall in Pullman WA. Schweitzer Hall will be a new Voiland College of Engineering and Architecture Student Success Building.
Bids are being requested by the Board of Regents of Washington State University, for the above referenced project. Project Scope: This project is to replace the existing DI water piping network consisting of failed fused-joint polypropylene piping with new glued-joint PVC piping in the Biotech/Life Sciences Building on the Pullman campus of Washington State University. […]